Before comparing prices
List each opening, its approximate dimensions, which parts should open and whether shutters or blinds must be retained. Photographs can support an initial discussion, but ask who takes final measurements and accepts responsibility for the manufactured sizes before an order is placed.
Compare the whole window, not the frame material alone. A quotation should identify the profile, glass specification, hardware and installation approach. A small fixed window is not a fair benchmark for a large opening window or a glazed door.
Reference prices and what they cover
Zaask’s body text describes this installation range including material; its examples have specific sizes. The headline is broader (€115–€1,200), and glazing details, finishing work and VAT need confirmation.
Scroll the table sideways to read all inclusions and exclusions →
| Service or scope | Published reference | Check the scope |
|---|---|---|
| Fixed window, 0.6 × 0.8 m | €115 per window | Sized Zaask example. Confirm the glass, fixing, access and finish; this is not a general fixed-window tariff. |
| Single-sash tilt-and-turn window, 0.6 × 0.8 m | €160 per window | A specific Zaask example, not a price valid for every product of this size; confirm glazing and installation details. |
| Two-sash tilt-and-turn window, 1.2 × 1.2 m | €360 per window | A specific Zaask example within its installation guide; do not scale it proportionally to other dimensions. |
| Two-sash sliding window, 1.2 × 1.2 m | €370 per window | Sized Zaask example, not proof of equivalence to the tilt-and-turn product in glass or performance. |
| Removal, making good and accessories | By quote | Request explicit prices or inclusion for disposal, reveals, sills, blinds and any access equipment. |
| Shutters, screens, motorisation and electrical work | By quote | Identify retained and new parts separately, including access to shutter mechanisms after completion. |
Independent budgeting information, not a quote or a Malleversa price list. Published third-party estimates are not guaranteed local rates. Confirm VAT, materials, labour, travel and any exclusions in writing. Malleversa does not set prices or guarantee professional availability or outcomes.
What changes the price?
Size and operation
Fixed, hinged, sliding and tilt-and-turn designs solve different access and ventilation needs. Ask for a labelled drawing showing opening directions, usable clearance and the number of moving parts.
Glass and performance
Request the proposed glazing build-up and declared performance for the complete window. Explain concerns such as traffic noise, summer sun or exposed weather; a generic double-glazing description is not a full specification.
Installation interfaces
Clarify how the installer will seal the perimeter and finish the inside and outside edges. If external insulation is planned, coordinate sills and reveals before either contractor finalises the dimensions.
Exposure and practical access
An upper-storey opening with no external working platform may need a different installation plan from a ground-floor unit. Coastal exposure, shading and noise sources should inform the product specification rather than being treated only as delivery information.
Read the price reference before using it
The published figures describe examples, not a catalogue that an installer must honour. Zaask gives €115 for a fixed window measuring 0.6 × 0.8 m, €160 for a one-sash tilt-and-turn window of that size, €360 for a two-sash tilt-and-turn window measuring 1.2 × 1.2 m and €370 for a two-sash sliding window of that larger size. These examples make more sense than applying one average to every opening in a home. Their glazing, site conditions and detailed finishing specification are not established here.
The source's €115–€370 body-text range and €115–€1,200 headline are not interchangeable estimates. Neither demonstrates a current market distribution or a maximum price for a bespoke installation. Ask for a dated offer based on your drawings. If a contractor's total is higher, first check the scope rather than assuming the difference is excessive. A difficult replacement, substantial glass package or extra building work can make a superficially similar window a different purchase.
Turn rooms into an opening schedule
Give every opening a reference, such as kitchen W1 or bedroom W2. Record approximate width and height, storey, orientation, the existing frame and whether access is possible from outside. Add photographs of the whole wall and closer views of the sill, shutter box and damaged areas. The first measurement helps the supplier price the job; it should not become the manufacturing size without a site survey.
Specify what each room needs. A kitchen window may have a tap obstructing an inward-opening sash; a bedroom may need a safe night-ventilation strategy and effective blackout. Show furniture, curtains and balconies on the sketch. Ask who signs off final sizes, glazing, colours and opening directions, and what happens if an opening is found to be out of square. Retaining an old outer frame can reduce disturbance but also reduce clear glass area and conceal defects, so compare that approach with complete removal.
Match the opening mechanism to daily use
A side-hinged window can give a generous opening and straightforward access to the inside face. Inward opening needs space for the sash to swing without hitting furniture; outward opening needs an external clearance and cleaning plan. Compression seals can perform well, but choose on declared performance rather than treating all hinged windows as identical. Think about handle reach, the force needed to operate it and whether a heavy sash will remain convenient for the intended user.
Tilt-and-turn combines a side-opening position with a limited tilt position. It is useful where people want different ways to air a room, but the actual movement and restrictions depend on the hardware. A tilted window is not automatically secure against intrusion, safe for children or suitable in heavy rain. Have the installer demonstrate the handle sequence and any restrictors rather than relying on a diagram alone.
Sliding sashes avoid a large swing into the room and can suit a narrow balcony or a broad opening. Check the clear opening, not just the overall frame width, because part of the opening usually remains occupied by a sash. Tracks need cleaning, and the thermal, acoustic and weather performance depends on the particular sliding system. Higher-performance sliding products exist; it would be misleading to judge every system by the weakest basic slider.
Tilt-and-slide, often called oscilo-paralela locally, uses hardware that brings the moving sash out from its closed position before it slides, with a tilt function where specified. It can be worth considering when space and sealing performance both matter. Ask to operate a sample: the mechanism, weight, threshold and servicing requirements may make a simpler arrangement preferable. Lift-and-slide is a different mechanism and should not be substituted without explaining the change.
Fixed glazing has no opening hardware and can be appropriate alongside an accessible opening sash. It does not ventilate the room and may be awkward to clean externally on an upper floor. A lower fixed-unit price is only a saving if the combined layout still meets the room's access, ventilation and safety needs. Compare usable daylight and sightlines as well as the number of opening leaves.
Separate heat loss, sunshine and noise
Uw describes thermal transmission through the complete window; Ug describes the glazing, and Uf the frame. Lower U-values indicate less heat transmission under the stated conditions. A quotation showing only an attractive Ug value has not established the performance of the assembled window. Ask whether the Uw declaration applies to the proposed configuration and dimensions or a reference size, and request the supporting product documentation.
Double glazing is a family of constructions, not a single performance grade. Pane thickness, cavity, coatings, spacer and frame all matter. Triple glazing may be suitable for some projects, but adds weight and must be assessed with the hardware and the overall building strategy. Do not infer that adding a pane doubles insulation or removes the need for heating. Existing roof and wall insulation, air leakage, exposure and heating habits affect the outcome.
Solar factor, often shown as g, concerns solar energy transmitted through glazing. A lower value may help an exposed room avoid overheating, but can also reduce useful winter solar gains; visible light transmission is a separate consideration. Explain orientation, shading and when overheating occurs. An external shutter or shade, glazing choice and ventilation plan should be considered together, rather than buying the darkest glass for every elevation.
For traffic noise, ask for acoustic performance of the complete proposed window and how the reported rating relates to the noise source. Rw is a laboratory sound-reduction rating; adaptation terms may matter when comparing traffic-noise proposals. Glazing composition and airtight seals are important, but noise can also enter through shutter boxes, vents, walls and installation gaps. No generic PVC profile or double-glazing label establishes a universal decibel reduction inside your particular bedroom.
ADENE's window guidance treats orientation, acoustics, frame choice, glazing and fitting as linked decisions. CLASSE+ provides a voluntary energy label and a product identification route that can help compare offers. It is not a substitute for the installation specification, and a window's product label is not the same thing as the energy certificate for the dwelling. Ask for the label where offered, together with the declared technical characteristics and applicable CE documentation.
Price the parts around the frame
Shutters can be retained, refurbished or replaced. Record whether the price includes the box, guides, slats, belt mechanism or motor and any electrical work. A new window beneath a draughty old shutter box can leave a major comfort problem unresolved. Access to the mechanism must remain possible after finishing. If motors are proposed, agree control positions, power supply and operation during a fault or power cut.
Fly screens need space and must coexist with shutters, handles and opening leaves. They are insect barriers, not fall protection or security barriers. Ask whether the mesh can be removed for cleaning and replaced without dismantling the frame. Concealed hinges, decorative handles, restrictors and special locks should be individually identified so that a cheaper alternative does not quietly remove a feature you depend on.
Colour and finish affect procurement and maintenance as well as appearance. A white frame, a coloured foil and a timber-effect surface are not necessarily produced in the same way. Ask for interior and exterior colour codes, cleaning instructions and limits relevant to solar exposure. Security also belongs to the complete assembly: hardware, glazing, fixing and frame work together. A multi-point lock alone does not prove a tested security rating, and window restrictors must be selected for the intended safety function.
Keep doors and marquises in a separate scope
A glazed patio door shares some components with a window, but thresholds, frequent use, accessibility, locking and glass safety introduce different requirements. A main entrance door is another specification again. The Zaask examples of secondary hinged and sliding doors are €600 and €650 respectively, and the entrance-door example is €1,100; all are shown at 2 × 1 m. These are sized source examples, not prices transferable to any door opening or glazing arrangement.
A PVC balcony enclosure, or marquise, is a small building-envelope project rather than several ordinary windows multiplied together. Survey the existing balcony, supports, exposed edges, drainage and connections to the building. Large glass areas can change summer comfort markedly. Roof glazing, guarding, structural support and the treatment of rainwater must be designed for the actual enclosure where relevant. Replacing an existing enclosure and closing an open balcony are not equivalent scopes.
Before agreeing either option, ask the municipality about the proposed external change and confirm the condominium position. Do not treat a neighbour's existing marquise as evidence that yours is authorised. Obtain a separate quotation covering construction work, weatherproofing, shading and any professional design, with the window or door units listed inside that broader package.
What a complete replacement should describe
The installer should explain how the frame is supported and mechanically secured, and how the joint to the wall will control air and rainwater while accommodating expected movement. Expanding foam or a visible bead of sealant is not, by itself, a complete description of a durable installation. Request a detail suitable for the wall and exposure, using compatible materials and leaving the product's drainage paths functional.
Removal can damage plaster, paint, external render, tiles or stone. Agree the extent of making good, the finish expected and who supplies replacement materials when an exact match is unavailable. Sills need an effective connection to the frame and a way to shed water away from the wall. Ask who assesses hidden decay, corroded fixings or loose masonry discovered after the old frame comes out, and require approval of variations before additional paid work proceeds.
Access may involve lifting equipment, scaffold or protection below the working area. It is not enough to price only the time spent inside the room. Confirm arrangements for common stairs, lifts, parking, waste loading and occupied premises. Removal of old units, transport and disposal should be explicit, including how reusable shutters or fittings will be stored. If suspect hazardous materials are uncovered, the work should pause for competent assessment instead of treating them as ordinary rubble.
Coordinate external insulation before finalising frame position, sill projection and reveal finishes. A window contractor and an ETICS contractor can each complete their own line item while leaving a vulnerable gap between them. A shared detail and named responsibility for that interface are more useful than two promises that the other trade will finish it later. Include internal decorating if it is required; it is often distinct from basic plaster repairs.
Make the home tighter without trapping moisture
Replacing leaky frames reduces uncontrolled draughts, but those draughts may previously have provided some of the home's air exchange. The replacement plan must preserve deliberate ventilation, particularly where extract fans, combustion appliances or existing air inlets are involved. Have a competent person assess those arrangements. Do not block an inlet because it appears to undermine the investment, and do not assume a trickle vent alone guarantees adequate ventilation.
Condensation on the room-side glass indicates a relationship between moisture, surface temperature and air movement. Cooking, showers and indoor laundry can increase the moisture load. Better windows may warm the glass surface, yet condensation can remain at a cold reveal or another poorly insulated element. Investigate leaks separately: water at a sill after rain is not necessarily condensation. Recording when and where moisture appears helps distinguish problems before a repair is selected.
Plan practical operation after installation. Check extract performance and replacement air paths, allow air to circulate around curtains and furniture, and discuss how the occupants can ventilate safely. A dehumidifier may manage a symptom but does not repair water ingress or replace a designed ventilation strategy. No supplier should promise a mould-free dwelling solely because the frames have changed.
PVC, aluminium or timber: compare actual products
PVC profiles can provide useful thermal performance with relatively modest routine surface maintenance. Reinforcement, joint construction and allowable sizes depend on the system, so large sashes need proper design rather than a thicker-looking profile alone. Aluminium can suit slender sightlines and demanding dimensions; thermally broken aluminium is a different proposition from older unbroken metal frames. Timber can suit traditional buildings and offers repair possibilities, but its coating and moisture protection need planned attention.
A fair comparison uses the same opening sizes, glazing, intended performance, hardware and installation work. Ask each supplier to explain why its proposal suits exposure, appearance and maintenance expectations. None of these materials guarantees good acoustics or a particular whole-window U-value on its own. Also distinguish a structural PVC frame from a PVC decorative covering applied to a different underlying product; the covering does not redefine the window's construction.
Whole-life value includes spare parts and repair access. A slightly cheaper unit can be a poor choice if gaskets, handles or sealed glazing cannot be readily replaced. Ask who fabricates the window, who supplies the profile system and who responds to a service call. These can be different businesses. Product traceability and a reachable installer are more helpful than an unsupported claim that one material is always the greenest.
Plan maintenance without an invented expiry date
There is no single lifespan applicable to every PVC window. Exposure, product formulation, fabrication, glass seals, hardware, installation and care all influence service life. UV resistance and colour stability depend on the manufacturer's system and finish. Ask what the actual warranty covers, whether colour change is addressed and which environmental or maintenance conditions apply. A warranty period is not a prediction of the exact time the window will fail.
Clean frames with methods approved for the finish, keep drainage openings clear and maintain hardware according to the supplier's instructions. Avoid aggressive solvents, abrasive cleaning and improvised painting of coloured profiles. Stiff operation should be checked rather than overcome with force. Record recurrent draughts, cracked seals, loose handles or water ingress early. Failed sealed glazing may be replaceable without changing the whole frame, subject to inspection and parts availability.
Use a maintenance record for the property, especially if several windows are installed at different times. Keep order references, photographs, labels and service notes together. In coastal or very exposed locations, ask whether cleaning and hardware care need to be more frequent. The appropriate schedule is a product- and site-specific instruction, not a blanket promise of maintenance-free performance for decades.
Resolve approvals and timing before manufacture
Ask the local municipal planning service about the exact proposal, including external colour, proportions, divisions, opening alterations and any protected-building status. The official municipal information consulted distinguishes different procedures and shows that exemption from prior control does not necessarily mean no obligations. Its local examples should not be applied as a universal rule for Portugal. Send drawings and photographs and retain the written response relevant to your address.
Where a condominium is involved, establish how façade decisions and access to common parts are to be approved and recorded. Municipal procedure and condominium agreement are separate checks. A change confined to your apartment may still affect a shared façade. Do not order bespoke frames until the appearance and scope are settled, because changes after manufacture can be costly.
Agree a programme that separates survey, technical approval, manufacturing, delivery and fitting. Ask how openings will be secured if the work cannot be completed in one day and whether weather can postpone external sealing. Clear the working route, remove curtains and fragile objects, and arrange safe separation for children and pets. Discuss working hours and noisy removal with neighbours rather than discovering restrictions when the delivery arrives.
A hypothetical budget, not a contractor's offer
Consider a made-up replacement package with two one-sash tilt-and-turn windows of 0.6 × 0.8 m and four two-sash tilt-and-turn windows of 1.2 × 1.2 m. For this arithmetic exercise only, assume supply-and-fit allowances of €250 and €500 per unit respectively. These invented allowances are not the Zaask examples or current market rates. The product package, glass and performance would still have to be specified before procurement.
The six units total €2,500: two multiplied by €250 plus four multiplied by €500. Suppose the fictional contract separately includes €300 for removal and disposal, €450 for reveal repairs and €250 for access and protection. The assumed subtotal is therefore €3,500 before VAT. If, solely to illustrate the calculation, all these items attract 23% VAT, tax is €805 and the total is €4,305. The applicable tax treatment must be established on the real quotation.
A separate owner-held reserve of 10% of the assumed pre-tax subtotal is €350, making an initial cash planning figure of €4,655 including that reserve. The reserve is not a quoted item or money automatically owed to the contractor. Any extra work needs approval and its own applicable tax treatment. This example excludes shutters, screens, electrical changes, structural work and final room repainting; add them explicitly if needed instead of assuming the reserve covers everything.
Scroll the table sideways to read all inclusions and exclusions →
| Assumed line | Calculation | Amount |
|---|---|---|
| Small windows | 2 × €250 | €500 |
| Larger windows | 4 × €500 | €2,000 |
| Removal and disposal | Separate allowance | €300 |
| Reveal repairs | Separate allowance | €450 |
| Access and protection | Separate allowance | €250 |
| Pre-tax subtotal | Sum of contract lines | €3,500 |
| Illustrative VAT | 23% × €3,500 | €805 |
| Contract total in this example | €3,500 + €805 | €4,305 |
| Separate owner reserve | 10% × €3,500 | €350 |
| Initial plan including reserve | €4,305 + €350 | €4,655 |
Choose a comparable offer and inspect the result
Put competing proposals into the same opening schedule. Compare glass, operating style, frame system, finish, declared performance and accessories line by line. Then compare removal, sealing, repairs, access and tax separately. A lump sum is easier to read but harder to challenge when an omission emerges. Ask for the validity period, deposit, payment milestones, cancellation terms and written process for changes before signing.
At handover, operate every sash through all intended positions without forcing it. Look for rubbing, loose handles, damaged finishes, incomplete seals and blocked drainage. Check the specified accessories, colour and glass identification against the order. Ask for a demonstration of cleaning, restrictors and any adjustment that the homeowner may safely make. Do not attempt an improvised hose-pressure test unless the contractor has agreed an appropriate method.
Record defects with photographs and a completion date for correction. Obtain the final invoice, product and installation warranty terms, care instructions, technical declarations and any agreed CLASSE+ information. Confirm whom to call if a fault appears after a period of use. A written snagging list distinguishes unfinished work from later maintenance and provides a much firmer basis for resolving problems than a verbal assurance that everything will settle down.
Plan before you commit
What to ask in a written quote
- Are final measurements, opening drawings and product references included?
- What glazing and complete-window performance are specified?
- Does the total include removal, disposal, sealing and making good?
- Are shutters, blinds, handles, access equipment and VAT included or excluded?
- What are the delivery, payment, installation and aftercare terms?
- Has the ventilation strategy been checked, including existing inlets and extract systems?
- Are final appearance and any municipal or condominium requirements settled before manufacture?
- Who coordinates window-to-ETICS connections, sill changes and shutter boxes?
- How are variations approved if hidden wall damage is discovered?
- Will handover include operation checks, a written snagging list, product records and care instructions?
Common questions
Is the lowest price per square metre the best comparison?
No. Two windows with the same area can have different sash counts, reinforcement, hardware and fitting conditions. Use the actual opening schedule, and ask suppliers to price the same configuration. Area can help organise measurements, but it does not turn unlike products into equivalent purchases.
Will new windows stop condensation immediately?
Not necessarily. Warmer glazing can reduce one cold surface, while tighter frames alter air exchange. Check moisture generation, extract ventilation, air inlets and cold reveals. Persistent damp needs diagnosis; a leak or rising damp should not be relabelled as condensation simply because windows are being replaced.
Must every window be tilt-and-turn?
No. A room may work better with a combination of fixed glazing and accessible opening sashes, or with a suitable sliding system. Plan cleaning, ventilation, clearance and safety first. Extra mechanisms are only useful when occupants can reach and use them comfortably.
Does double glazing guarantee a quiet bedroom?
No. Ask about the complete window's acoustic specification and the noise source. Air gaps, shutter boxes and ventilation openings can limit the result, and sound may travel through the rest of the façade. An acoustic assessment is worthwhile where noise is a principal reason for the investment.
Is PVC always more efficient than aluminium?
No. Compare declared complete-window performance for equivalent products. A well-designed thermally broken aluminium window can outperform a poorly specified PVC assembly, and the reverse can also be true. Frame material is only one part of the glass, frame, seals and installation combination.
Can a tilted window be left open as a security measure?
Do not assume that. A tilt position is an opening mode, not evidence of burglary resistance or child protection. Ask about compatible safety devices and the intended use. At accessible levels, discuss a secure ventilation solution rather than relying on a partly open window.
Can I reuse the existing shutters?
Often they can be considered for retention, but their condition and connection to the new frame must be surveyed. Check clearances, guides, insulation of the box and future servicing access. Require a separate allowance for repairs if the contractor cannot include them as a defined fixed scope.
Do windows need a CLASSE+ label?
CLASSE+ describes its window energy labelling as voluntary. It can help you compare energy performance and identify a product later, but does not replace technical declarations or fitting quality. Any grant requirements must be checked against a specific current programme, not inferred from possession of a label.
How many years will PVC last without yellowing?
No universal number is defensible. Ask the manufacturer about the exact profile and finish, UV exposure, cleaning restrictions and written warranty coverage. Frames, gaskets, hardware and sealed glazing age differently, so replacement of a worn component may be more appropriate than replacing the entire window.
Should windows or external insulation come first?
Have both contractors agree the sequence and the frame-to-wall detail before placing orders. Frame position, sill reach, insulation returns and weather seals must work together. The best sequence depends on the building and project; handing unfinished junctions from one trade to another without drawings invites avoidable defects.
Can I close a balcony for the price of several windows?
Not reliably. An enclosure can require structural assessment, drainage, roof or edge connections, shading and permissions, as well as glazing. Price it as a separate project. A quote that covers only frames can leave the most consequential building work and approval questions unresolved.
What should I do if the fitted window rubs or leaks?
Record the problem and contact the installer promptly, keeping the opening reference and photographs. Avoid forcing hardware, drilling drainage holes or applying random sealants before inspection. The cause may be adjustment, a product defect or a wall-junction issue, and the remedy should address the cause rather than disguise it.
Sources and limitations
Zaask substantiates the limited range and sized examples, not a complete market price or a Malleversa offer. Its headline and body differ; no unspecified glazing package, energy saving or VAT treatment is assumed here. ADENE and CLASSE+ support the performance and labelling guidance; numerical regulatory thresholds and warranty statements in the older ADENE brochure are not adopted as current rules. Municipal information is used only to explain the need for a local check. The worked budget is an invented arithmetic example.
- Zaask — Janelas PVC (Sources checked: )
- ADENE / CLASSE+ — Conhecer a etiqueta e as janelas eficientes (Sources checked: )
- ADENE / CLASSE+ — Perguntas e respostas (Sources checked: )
- ADENE — Janelas eficientes (2016 technical guide; not current regulatory thresholds) (Sources checked: )
- Município de Carregal do Sal — Perguntas frequentes de urbanismo (local guidance) (Sources checked: )
These guides combine limited, attributed public price references with original budgeting advice. They are not based on a Malleversa transaction survey. Prices depend on the location, specification and professional; a written, itemised quote is the basis for a decision.